Alice Griffith Complex Redevelopment

Alice Griffith Housing

Blocks 1, 2 and 4

General Contractor: BGI
Owner: McCormack Baron Salazar
Master Developer: Lennar Urban Division
Architect: Torti Gallas & Partners
Associate Architects: AE3 Partners and BDE Architecture
Location: San Francisco, CA
Completed: 2017

Role

Construction Performed

  • General Contractor
  • Performed Sub-contract: Concrete

Project Details

Alice Griffith is an existing 256-unit public housing development owned and managed by the San Francisco Housing Authority. It will be redeveloped into 504 units of multifamily, mixed-income housing (i.e., 256 replacement public housing units and 248 affordable units) on seven blocks. The seven blocks are located on parts of the existing site and also on vacant land adjacent to the current public housing. The development will include a management/easing office, community facilities, on-site (structured) parking, tot lots and green space.

A joint venture project with Baines Group Inc., phases I and II (Blocks 2 and 4) will consist of 93 units and 91 units, respectively, for a total of 184. Block 1 will consist of 122 apartment units over a concrete at grade parking structure. Each block will consist of apartment units over a concrete at grade parking structure. The units will consist of one, two and three bedroom units in four stories over a podium, three and four bedroom townhouses, and units fronting the parking structure facing the street. Each building will have a courtyard on top of the podium (2nd level) and community space.

Now in construction, Block 5 will consist of 31 apartment units over a concrete at grade parking structure. The 38,588 sq.-ft. project consist of 12 one­ bedroom, 6 two-bedroom, 10 four-bedroom and 3 five-bedroom. Amenities include 18 parking stalls, a playground and an out-door barbecue area.

The Alice Griffith HOPE SF Redevelopment Project will be a mixed-income community with a diverse range of housing types. It will serve as a link between the overall larger Hunters Point Shipyard I Candlestick Point development and the surrounding Bayview area. Per the initial Hunters Point Shipyard I Candlestick Point Master Plan, most of the steep grades that created additional barriers to pedestrian and vehicular traffic will be re-graded. The new Alice Griffith community will be planned around a centrally located community park that extends the length of the new development.The site will continue to be occupied during construction.

Project Highlights

  • Square Footage

    1,000,000

  • Delivery

    CM/GC

  • Owner

    McCormack Baron Salazar

  • Architect

    Torti Gallas & Partners

  • Associate Architects

    AE3 Partners and BDE Architecture

  • Location

    San Francisco, California

  • Project Type

    Affordable Housing

  • Completion Dates

    Block 1 - November 2017

    Block 2 - April 2017

    Block 4 - April 2017

BGI Expertise

Provided both Construction and Construction Management services from Site Mobilization to Closeout. BGI worked through-out the entire duration of the project.

BGI Logo

Corporate Headquarters

Baines Group, Inc. (BGI)
1485 Bayshore Blvd., Suite 381
San Francisco, CA 94124
Office: 415-240-4100
Email: info@bgiconstruction.com

Oakland Office

562 14th Street,
Oakland, CA 94612
Office: 510-238-4666

Sacramento Office

(Opening Soon)

Follow Us

© 2023 BGI Construction. All Rights Reserved.